Vibratec has just finalized the installation of heavy gym floors for Zengun. The floating floors are spring supported concrete slabs and the gym is situated on the 8:th floor (the picture shows Vibratec’s spring battens).
The top concreting has just been finalized. Vibratec has also installed the elastically suspended heavy ceilings and absorbent panels.