Vibratec helps prevent vibrations at project “Nya Sjukhuset Malmö”
PEAB where in the process of building a loading dock for receipt of goods in the project “Nya Sjukhuset Malmö”.
The loading dock was placed under roof in the building. Since heavy vehicles enters the loading dock, vibrations
could easily be transferred to the frame of the building causing disturbances.